Add to Calendar
When:
June 12, 2019 @ 11:45 am – 12:15 pm
2019-06-12T11:45:00-05:00
2019-06-12T12:15:00-05:00
Cost:
Free
Contact:
Join us for our next webinar on ECE’s Material Management System for controlling materials with CAD data using SOCKETWorx and DBWorx.
We’ve now integrated material management and procurement to be synchronized with your CAD data and Isometric deliverables. What this allows us to do is further centralize line list data, in-line component list data, maintain a parts catalog, integrate catalog data with the CAD platform, and create material requisitions (Bulk buys or Model buys). In addition, we’ll showcase the following:
- Automatically report line list versus 3D model discrepancies
- Automatically report material requirements between Bulk Buys & 3D Model
- Consume, or issue, materials by project, unit, area, spool, etc.
- Capture component information per fabrication drawing.
- Electronically load MRP systems (if required).
Presenter: George Montgomery, ECE Design