Managing isometric workflow processes steals critical time from often under-budgeted projects. Rarely do isometrics come out perfect and go directly to the shop with all the required information. Companies spend hours trying to keep track of the different stages of an Isometric.
ISOWorx reduces the time needed to manage your isometric workflow, allowing you to reallocate this time to other project areas.
Join us for our next webinar, where we use ISOWorx to funnel our isometrics through the desired workflow. In our updated interface, we can view each stage of the process to assess our project’s status quickly. Along with new Staging folders, we have a new Archive folder to backup isometrics before being processed. All this results in a more robust and easier to use ISOWorx. In this webinar, we will demonstrate:
- Managing and adding Staging folders
- Adding an Archiving folder
- Review our updated Interface
Presenter: Matt Worland, ECE Design
Is Cable Tray and Conduit routing a project requirement? If so, why not leverage Plant 3D for this and produce EI&C plans leveraging the inherent intelligence? During this Webinar, ECE will demonstrate how Plant 3D can be used to produce drawings and material lists.
Webinar agenda
- Identify EI&C modeling scopes of work using Plant 3D & ELECTROWorx.
- Leverage the line numbering tray or conduit numbering.
- Visualization, design review & clash detection
- Generate plan and detail drawings complete with BOMs
Presenter: George Montgomery, ECE Design